Wind Turbine Team Leaders & Technicians (Mechanical, Cable & Quality Assurance)

Wind Turbine Team Leaders & Technicians (Mechanical, Cable & Quality Assurance)

Posted 1 day ago by Linnk Group

Negotiable
Undetermined
Undetermined
Stranraer, Scotland, United Kingdom

Summary: The role involves recruiting experienced Wind Turbine Professionals for a wind energy project in Stranraer, Scotland, focusing on assembly, installation, and quality assurance. Candidates must have hands-on leadership skills and prior experience with Vestas turbines, specifically the V162, 4 MW model. The position requires managing mechanical assemblies, cable works, and ensuring compliance with quality standards. The contract duration is 4 to 5 months with a shift pattern of 6 weeks on and 2 weeks off.

Key Responsibilities:

  • Drive continuous improvement and lean manufacturing initiatives to optimise assembly times.
  • Oversee and execute hands-on mechanical builds, cable installation, and pre-assembly on wind turbine components.
  • Act as a Team Leader, mentoring technicians, managing daily operations, and conducting toolbox talks.
  • Implement and enforce Quality Assurance (QA) standards, conduct inspections, and ensure compliance with project manuals.
  • Coordinate lifting, slinging, and banking operations on site safely.
  • Interpret technical drawings, AWP/PWI method statements, and ensure accurate reporting.

Key Skills:

  • Prior Vestas experience, specifically with V162, 4 MW turbines.
  • Safety & Technical: BST (Basic Safety Training) and full BTT (Basic Technical Training), including Bolt Tightening and Installation.
  • Lifting & Tele handling: CCNSG, CPCS (Slinger Banksman/Telehandler), or NPORS equivalent.
  • Access Equipment: IPAF 3a & 3b (or equivalent machine tickets).

Salary (Rate): undetermined

City: Stranraer

Country: United Kingdom

Working Arrangements: undetermined

IR35 Status: undetermined

Seniority Level: undetermined

Industry: Other

Detailed Description From Employer:

Wind Turbine Team Leaders & Technicians (Mechanical, Cable & Quality Assurance)

Location Scotland

Contract role – duration 4 – 5 months

Accommodation is supplied

Shift pattern 6 weeks on and 2 weeks off

No sponsorship offered

Job Summary

We are recruiting for a team of experienced Wind Turbine Professionals to drive the assembly, installation, and quality assurance of a wind energy project at Stranraer, Scotland. We are looking for hands-on and proactive leaders to manage pre-installation, mechanical assemblies, cable works, and QA compliance. Prior Vestas experience is essential and the specific turbines are V162, 4 MW.

Key Positions We Are Sourcing:

  • Team Leader / Support: Prep, Preinstallation, Mechanical & Cable
  • EnVentus Quality Assurance (QA) Team Leader & Support

Core Responsibilities

  • Drive continuous improvement and lean manufacturing initiatives to optimise assembly times.
  • Oversee and execute hands-on mechanical builds, cable installation, and pre-assembly on wind turbine components.
  • Act as a Team Leader, mentoring technicians, managing daily operations, and conducting toolbox talks.
  • Implement and enforce Quality Assurance (QA) standards, conduct inspections, and ensure compliance with project manuals.
  • Coordinate lifting, slinging, and banking operations on site safely.
  • Interpret technical drawings, AWP/PWI method statements, and ensure accurate reporting.

Essential Requirements & Tickets

Prior Vestas experience is essential and the specific turbines are V162, 4 MW.

Safety & Technical: BST (Basic Safety Training) and full BTT (Basic Technical Training), including Bolt Tightening and Installation.

Lifting & Tele handling: CCNSG, CPCS (Slinger Banksman/Telehandler), or NPORS equivalent.

Access Equipment: IPAF 3a & 3b (or equivalent machine tickets).

I look forward to discussing your application with you.