SDL Deployment and Integration Engineer (Nokia SSP Product)

SDL Deployment and Integration Engineer (Nokia SSP Product)

Posted Today by 1759916553

Negotiable
Outside
Remote
USA

Summary: The SDL Deployment and Integration Engineer will focus on the deployment and integration of Nokia's SSP product, specifically within a 5G SA Core network environment. The role requires strong expertise in cloud networking and Kubernetes, as well as experience with Nokia SDL and One-NDS. The position is remote and requires a commitment of 40 hours per week for a duration of 12 months or more.

Key Responsibilities:

  • Verification of cloud environment (image, flavor, network, etc.) and perform installation.
  • If the installation is not successful, perform the rollback procedure as defined in the MOP and conduct a Root Cause Analysis (RCA) for the failure.
  • If the installation is successful, do the health check of the system and ensure all the applications are performing correctly.
  • Integrate the application with other peer nodes as per the deployment plan.
  • Troubleshooting.

Key Skills:

  • Strong 5G SA Core N/W Architecture and Call flow
  • Strong Cloud N/w and Kubernetes
  • Strong Nokia SDL and/or One-NDS Experience
  • Strong Nokia SDL/One-NDS Deployment & Integration

Salary (Rate): undetermined

City: undetermined

Country: USA

Working Arrangements: remote

IR35 Status: outside IR35

Seniority Level: undetermined

Industry: IT

Detailed Description From Employer:
Contact Details:

1.Harika Mamidala
Email:
Cell:
2.Saravanan Ganesan
Email:
Cell:
Job Title: SDL Deployment and Integration Engineer (Nokia SSP Product)
Location: Remote
Duration: 12 Months+
Years of Experience: 5+ yrs.
Required Hours/Week: 40hrs./Week

Skills and Experience Required:

  • Strong 5G SA Core N/W Architecture and Call flow
  • Strong Cloud N/w and Kubernetes
  • Strong Nokia SDL and/or One-NDS Experience
  • Strong Nokia SDL/One-NDS Deployment & Integration
Duties and Responsibilities:
  • Verification of cloud environment (image, flavor, network, etc.) and perform installation.
  • If the installation is not successful, perform the rollback procedure as defined in the MOP and conduct a Root Cause Analysis (RCA) for the failure.
  • If the installation is successful, do the health check of the system and ensure all the applications are performing correctly.
  • Integrate the application with other peer nodes as per the deployment plan.
  • Troubleshooting.