ROLE RESPONSIBILITIES
- All activities associated with ensuring compliance with the PMP process from conception to close out, including:
- Ensuring that PMP preparation involves timely consultation with all relevant SME (e.g., Safety Case Manager, Environment Specialist, Security & Resilience Manager, COMAH.
- Ensuring that the PMP is filled in correctly, in totality.
- Ensuring that all hazards which may arise from a misconceived or inadequately implemented modification are identified and the consequences considered.
- Ensuring that all supporting safety assessments (e.g., radiological, nuclear, environmental or conventional) are available with the PMP.
- Assigning a provisional safety category to the PMP.
- Advising the Level 4 RIM of PMP's categorised as A, B, E1 or CC1.
- Arranging, where required, the presentation of the PMP to the relevant safety committee(s).
- Ensuring that where a PMP could affect safety, environmental or COMAH performance in another plant, it is submitted to the other relevant PMP Committee(s) for consideration.
- Arranging, where required, submission of the PMP to ONR/EA.
- Ensuring that the PMP is fully implemented, tested and closed.
- Ensuring that if, during PMP implementation, circumstances change or are different to those previously agreed in the PMP, work is stopped and the impact on the PMP is assessed.
- Ensuring that plant drawings are updated as required.
- Confirming that Safety Case Implementation is complete.
- Providing hold point release information in accordance with a hold point release schedule in accordance with SLP 4.07.06.
- Ensuring that, if required, a replacement PMP Manager is identified and that adequate handover of the PMP takes place.
- A change of PMP Manager must be agreed by the Head of Operations or Deputy and communicated to the PMP co-ordinator team.
- Generating and signing PMP amendments - refer details in section 1.8.
- Implementation of the Overdue PMP Reporting process (Appendix 2).
- Attending all required PMP surgeries and providing a current and accurate update of the status of the PMP.
ESSENTIAL CRITERIA
- PMP Manager SQEP is in line with the requirements of SR0997.
- Demonstrable experience as a PMP manager leading Cat B-E PMP's.
- Project Management or Engineering background.
- Strong understand of plant systems and design basis such as engineering substantiation and safety case principles.
- Deep understanding of LC22 requirements.
- Experience of Safety case production and implementation.
- Experience of Nuclear hazard identification and assessment (HAZOP).
- An understanding of ONR Technical assessment guides (TAGs).
- Ability to obtain SC level security clearance (this includes but is not limited to identity, employment, financial and criminal record checks plus 5 years' worth of UK residency).
DESIRABLE CRITERIA
- Experience working on complex infrastructure or nuclear projects.
Industry:
Project Management
Seniority Level:
Not Specified