Oracle Primavera Cloud Consultant

Oracle Primavera Cloud Consultant

Posted Today by Whitehall Resources

Negotiable
Inside
Onsite
Derbyshire

Summary: The Oracle Primavera Cloud Consultant role involves working with a key client to extend the implementation of Oracle Primavera Cloud functionality within the Manufacturing & Engineering sector. The consultant will replace custom tools with Primavera solutions and ensure effective delivery of services to customers. This position requires on-site work in Derby 2-3 times per week and is classified as inside IR35. The contract duration is initially set for six months.

Key Responsibilities:

  • Extension of Oracle Primavera Cloud solution and replace any custom tool/solution with Primavera.
  • Be responsible for the solution provided to customers and help to deliver.
  • Able to drive the area independently and document requirements and activities as required for the extended team.

Key Skills:

  • Ability to analyze requirements and translate them into feasible solutions in Primavera.
  • Capability to engage in independent conversations with business users.
  • Strong presentation and communication skills.
  • Understanding of the manufacturing industry (preferable).
  • Experience in implementing Primavera solutions based on requirement fitment.
  • IT background with the ability to design and develop solution architecture for consolidation of existing PM solutions.
  • Experience in integrating OPC with other ERP and manufacturing applications.

Salary (Rate): undetermined

City: Derbyshire

Country: United Kingdom

Working Arrangements: on-site

IR35 Status: inside IR35

Seniority Level: undetermined

Industry: IT