Offshore 66kV SAP

Offshore 66kV SAP

Posted 7 days ago by Carbon60

£750 Per day
Inside
Undetermined
Hartlepool, England, United Kingdom

Summary: The Offshore 66kV SAP role involves ensuring safe working practices and compliance with health and safety regulations while working on the Dogger Bank wind farm. The position requires the individual to perform SAP duties, produce switching schedules, and assist in the testing and commissioning of high voltage systems. The role is based offshore in the UK with a rotation schedule of 2 weeks on and 2 weeks off, starting in January 2025 for a duration of 6 months with potential extensions.

Key Responsibilities:

  • Ensure safe working practices are in place and report incidents.
  • Undertake risk assessments and audits, promoting a positive Health and Safety culture.
  • Perform SAP duties as required, reporting to Lead SAP.
  • Produce and review switching schedules.
  • Provide isolations and safety documentation for Dogger Bank wind farm.
  • Work under project High Voltage safety rules.
  • Assist in the testing and commissioning of HV/LV systems.
  • Provide personal supervision if required.
  • Conduct and review point of work risk assessments.
  • Drive the commissioning process by representing project standards for safety and quality.
  • Support commissioning engineers during walkdowns.

Key Skills:

  • Full GWO: Sea Survival, First Aid, Manual Handling, Fire Awareness, Working at Heights.
  • Offshore medical certificate including Chester Step.
  • Offshore HUET.
  • Knowledge of WTG WTSR.
  • Knowledge of Electrical Safety Rules.
  • ONC/HNC or equivalent qualification in Electrical Engineering.
  • Current Senior Authorised Person authorisation to 66KV or above.

Salary (Rate): £750 daily rate

City: Hartlepool

Country: United Kingdom

Working Arrangements: undetermined

IR35 Status: inside IR35

Seniority Level: undetermined

Industry: Other

Detailed Description From Employer:

Role: 66kV SAP

Location: Offshore UK

Rotation: 2/2 (Must be flexible as 3/3 rotations may be required occasionally)

Start Date: January 2025

Duration: 6-Months + Likely Extensions

Rates: £750 Daily Rate Inside IR35 via Umbrella

Clearance: BPSS (DBS/DS, Financial Probity, Employment History) + Medical Questionnaire & Proof of Right to Work in the UK

Description: Ensure safe working practices are in place, reporting incidents, undertaking risk assessments and audits, promoting a positive Health and Safety culture. SAP duties as required reporting to Lead SAP. Producing and reviewing switching schedules. Provide isolations and safety documentation for Dogger Bank wind farm Working under project High Voltage safety rules (Model Distribution Safety Rules) Assisting in the testing and commissioning of HV/LV systems Provide personal supervision if required Conduct and review point of work risk assessments Further shared responsibilities within the wider team include driving the commissioning process by representing project standards for safety and quality, with further scope to develop competencies under the WTSR and support commissioning engineers during walkdowns.

Required: Full GWO: Sea Survival, First Aid, Manual Handling, Fire Awareness, Working at Heights. Offshore medical certificate including Chester Step Offshore HUET Knowledge of WTG WTSR Knowledge of Electrical Safety Rules ONC/HNC or equivalent qualification in Electrical Engineering Current Senior Authorised Person authorisation to 66KV or above